rblog

iPhone 5 – clock not working

Since I fear being hunted down by the Apple fanboys I know I have to behave when describing what I feel about my iPhone 5c right now which has a clock that does not work (the clock, how hard can it be?) And if you do not believe me, look at this link.

I do actually have my second phone now in just two weeks, both have the same issue, the whole medical history can be found posted here

Grand opening at Løken

Yesterday me and Iver went to Løken for the grand opening of the new bus stop, miljøgata (whatever that is in English) and the walkway. My son Iver learned about budgets and HSE, he found it really interesting (me to…). But then he got cake and orange juice, so he was happy.

The never ending story – renovation of the outbuilding

And yet another update, all pictures from last month. All cleaned up, ready to start with the retaining

Having put down the styrofam that goes under the concrete base

Elin is painting, the front loader is the ultimate tool.

Still more painting

The concrete base is ready, easy one

Started doing the formwork, this bit is tricky. The bridge ready for the wheelbarrow.

Formwork ready, looks a bit chaotic.

All ready, sand in the front loader bucket, crushed rock next to it together with the cement bags and finally the cement mixer.

The casting is done, best of all, the formwork did not break, a small thanks to my engineering but most of all luck.

Elin painting some more. and we have started to level the lawn in front.