rblog

The never ending story – renovation of the outbuilding

And yet another update, all pictures from last month. All cleaned up, ready to start with the retaining

Having put down the styrofam that goes under the concrete base

Elin is painting, the front loader is the ultimate tool.

Still more painting

The concrete base is ready, easy one

Started doing the formwork, this bit is tricky. The bridge ready for the wheelbarrow.

Formwork ready, looks a bit chaotic.

All ready, sand in the front loader bucket, crushed rock next to it together with the cement bags and finally the cement mixer.

The casting is done, best of all, the formwork did not break, a small thanks to my engineering but most of all luck.

Elin painting some more. and we have started to level the lawn in front.